问题:单选题A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A z/OS, DS8000, TSMB TSM, LTO-5, VMwareC System ...
查看答案
问题:单选题IBM SONAS provides extreme scale out capability, a globally clustered NAS file system built upon().A NFSB GPFSC CIFSD NTFS...
问题:单选题A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products b...
问题:单选题A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are runnin...
问题:单选题A customer is considering the purchase of an XIV system to leverage thin provisioning. They are concerned that their application will use all available space during formatting, which will remove any thin provisioning benefits. What should the storage s...
问题:单选题A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's...
问题:单选题A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The cus...
问题:单选题Which of the following tools can be used to configure the IBM System Storage DS8000? ()A IBM Systems DirectorB Unisphere Management SuiteC IBM System Storage Productivity Center (SSPC)D IBM Standalone Solutions Configuration Tool (SSCT)...
问题:单选题In order to cluster IBM SONAS interface nodes so that they can serve the same data, the interface nodes must coordinate their locking and recovery. This coordination is done through().A SONAS Health CenterB SONAS Cluster ManagerC Tivoli Storage Manager...
问题:单选题A customer is looking for a solution to provide high performance storage. A competing vendor has proposed a solution based on a loosely coupled model of 1Gbps iSCSI and SATA disks. What alternative solution could be proposed that is cost-effective and ...
问题:单选题A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()A Metr...
问题:单选题A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. ...
问题:单选题What is required for the minimum configuration of the TS7650 ProtecTIER Appliance console? ()A 50 MB of available disk space and 128 MB of RAMB 100 MB of available disk space and 256 MB of RAMC 200 MB of available disk space and 512 MB of RAMD 300 MB o...
问题:单选题Which IBM tape interface architecture has the best performance and distance characteristics? ()A SASB SCSIC ESCOND Fibre Channel...
问题:单选题A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to incre...
问题:单选题A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()A TCOnow!B Disk MagicC Batch MagicD...
问题:单选题On both the IBM SAN764B and the IBM SAN384B Fiber Channel Directors, all of the followingSmall Form Pluggable plus (SFP+) optical transceivers are supported EXCEPT:()A 1Gbps+B 2Gbps+C 4Gbps+D 8Gbps+...
问题:单选题A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()A verify configurationB conduct pre-install TDAC complete physical planningD verify the solution meets requirements...