问题:单选题A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best det...
查看答案
问题:单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A Re...
问题:单选题The client team tends to bring the pSeries technical specialist in very late in the process. This has caused several problems where the specialist has had to correct some misunderstandings about the technology. The specialist is getting very frustrat...
问题:单选题A solution provider has identified a number of risks with a configuration in a customer’s request for bid. What is the most appropriate action to take to mitigate those risks for the customer?()A Decide not to bid.B Provide a solution in the bid.C Pro...
问题:单选题During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which...
问题:单选题A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()A Implementing CoDB Using Express Configura...
问题:单选题A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2. The application is sized for an 8-way 1.65-GHz machine. They do not currently have an existing HMC that supports p5 machines. This organiza...
问题:单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries tech...
问题:单选题The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different L...
问题:单选题A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenanc...
问题:单选题A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IB...
问题:单选题A customer called and indicated that their p690 system did not come with any installation and user manuals. Which of the following sources can best provide this information? ()A IBM RedbooksB IBM SupportlineC pSeries LibraryD pSeries College...
问题:单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may lat...
问题:单选题The customer intends to install a 7315-CR2 into a p690 frame. What should the pSeries technical specialist tell the customer?()A The HMC is a 19 form factor.B The HMC is a 24 form factor.C The HMC requires a 100-120 volt power connection.D The HMC req...
问题:单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A Is there a need for a PKI Management System?B I...
问题:单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and datab...
问题:单选题The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications ...
问题:单选题A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer s...